Tight envelope
Continuous airtightness for energy saving.
Technical core
Central zone for MEP installations.
Triple glazing
Three-pane window system for insulation.
Thermal bridge
Interrupted insulation point; must be minimized.
Operational energy
Energy used during building life.
Overhangs
Architectural shading elements.
On-site assembly
Fast, clean construction phase.
OSB sheathing
Structural board in SIP panels.
Orientation optimization
Maximizing solar gain/shading.
On-site assembly of prebuilt modules.
Ensures fresh, filtered indoor air.