Tight envelope
Continuous airtightness for energy saving.
Technical core
Central zone for MEP installations.
Triple glazing
Three-pane window system for insulation.
Thermal bridge
Interrupted insulation point; must be minimized.
Louvres and shading
Passive cooling components.
Low-voltage system
Efficient electrical systems.
Load-bearing structure
Structural frame of the building.
Life-cycle analysis (LCA)
Environmental impact study.
Laminated wood
Engineered timber products.
Timer controls
Automate systems for efficiency.