Tight envelope

Continuous airtightness for energy saving.

Technical core

Central zone for MEP installations.

Triple glazing

Three-pane window system for insulation.

Thermal bridge

Interrupted insulation point; must be minimized.

Timer controls

Automate systems for efficiency.

Joule efficiency

Efficiency of energy conversion devices.

Joint layout

Seam alignment in panelized construction.

Joist insulation

Thermal barriers within floor/roof joists.

Junction detailing

Smart construction of meeting points.

Joint sealing

Airtight detailing of panel seams.